RavenTrack
Project manager and superintendent reviewing a tablet and drawings inside a building under construction

Financial Intelligence

Know where every construction dollar goes.

Project cost control fails when the numbers arrive late. RavenTrack keeps project position current as purchases are captured, coded and approved.

Available today

The problem

What gets in the way today.

Month-end surprises

Overruns appear after the work is already done and the materials are installed.

Committed vs actual

Ordered material and spent material are tracked in different places, if at all.

Quoting blind

Without accurate historical job cost, the next bid repeats the last mistake.

Capabilities

What RavenTrack does here.

Live cost position

Actual spend against budget by project, phase and cost code.

Cost-code structure

Works with the cost-code system a company already uses.

Variance visibility

Categories drifting from budget surfaced while the job is running.

Historical job cost

Completed project data available to inform estimating.

Actual vs budget

Illustrative product view

Maple Ridge Ph.2$1422k of $1850k · 77%
Harbour Lofts$902k of $980k · 92%
Civic Transit Pad$1180k of $2400k · 49%

412

Documents this week

87%

Auto-posted

54

Awaiting review

Project manager and superintendent reviewing a tablet and drawings inside a building under construction

Outcomes

What changes as a result.

  • Cost conversations based on current numbers.
  • Earlier warning on categories trending over budget.
  • Better historical data for future bids.

Talk to us about financial intelligence.

Book a demo of the product as it works today, or start a conversation about what is being built next.