
Financial Intelligence
Know where every construction dollar goes.
Project cost control fails when the numbers arrive late. RavenTrack keeps project position current as purchases are captured, coded and approved.
Available today
The problem
What gets in the way today.
Month-end surprises
Overruns appear after the work is already done and the materials are installed.
Committed vs actual
Ordered material and spent material are tracked in different places, if at all.
Quoting blind
Without accurate historical job cost, the next bid repeats the last mistake.
Capabilities
What RavenTrack does here.
Live cost position
Actual spend against budget by project, phase and cost code.
Cost-code structure
Works with the cost-code system a company already uses.
Variance visibility
Categories drifting from budget surfaced while the job is running.
Historical job cost
Completed project data available to inform estimating.
Actual vs budget
Illustrative product view
Maple Ridge Ph.2$1422k of $1850k · 77%
Harbour Lofts$902k of $980k · 92%
Civic Transit Pad$1180k of $2400k · 49%
412
Documents this week
87%
Auto-posted
54
Awaiting review

Outcomes
What changes as a result.
- Cost conversations based on current numbers.
- Earlier warning on categories trending over budget.
- Better historical data for future bids.
Talk to us about financial intelligence.
Book a demo of the product as it works today, or start a conversation about what is being built next.
